1917

From Bristol Railway Archive
Jump to: navigation, search

March

10th. Hallen Halt reopened after closing in 1915.

April

2nd. Twerton-on-Avon station closed as a wartime measure.
29th. Hampton Row Halt closed.

May

Doubling of Filton to Avonmouth line completed.
14th. Hotwells Halt opened.

November

1st. Ashton Gate Platform closed as a wartime economy measure.

exact date not known

Line between Avonmouth and Filton doubled.
Hallen Marsh Junction signal box opens.