1928

From Bristol Railway Archive
Jump to: navigation, search

Portbury Shipyard Loop and signal box reopened.

July

9th. Through services between Avonmouth and Pilning commenced.
9th. Cross Hands Halt opened.
9th. New Passage Halt opened.
9th. Nightingale Valley Halt opened
9th. Pilning Low Level station opened.
9th. Pilning renamed Pilning High Level.

August

Ashton Gate Platform renamed Ashton Gate.

October

13th. The Charfield railway disaster takes place.