1905: Difference between revisions
Jump to navigation
Jump to search
New page: == exact date unknown == Crown Brickyard Level Crossing opened. Category:Timeline |
No edit summary |
||
| (3 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
== January== | |||
Engine shed at [[Shirehampton]] closed. | |||
== May == | |||
1st. Nailsea Station renamed [[Nailsea and Backwell]]. | |||
== July == | |||
5th. WT Tummy, [[Twerton]] stationmaster, suspended from duty for cash irregularities. | |||
== December == | |||
12th [[Sandford and Banwell|Sandford]] signal box opened. | |||
== exact date unknown == | == exact date unknown == | ||
[[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened. | [[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened.<br> | ||
[[Fishponds|Fishponds Signal Box]] fitted with a new frame.<br> | |||
Down goods loop added at [[Patchway]] station. | |||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 13:56, 1 January 2010
January
Engine shed at Shirehampton closed.
May
1st. Nailsea Station renamed Nailsea and Backwell.
July
5th. WT Tummy, Twerton stationmaster, suspended from duty for cash irregularities.
December
12th Sandford signal box opened.
exact date unknown
Crown Brickyard Level Crossing opened.
Fishponds Signal Box fitted with a new frame.
Down goods loop added at Patchway station.