1906: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
== July == | == July == | ||
9th. [[Avoncliff|Avoncliff Halt]] opened. | 9th. [[Avoncliff|Avoncliff Halt]] opened.<br> | ||
9th. Avon & Gloucester Railway officially closes. | |||
== September == | == September == | ||
15th. [[Ashton Gate]] | 15th. [[Ashton Gate|Ashton Gate Platform]] opened for football traffic. | ||
== October == | == October == | ||
1st. Regular passenger services started at [[Ashton Gate|Ashton Gate Platform]].<br> | |||
3rd. [[Ashton Swing Bridge]] opened by the Lady Mayoress, Mrs A.J.Smith.<br> | 3rd. [[Ashton Swing Bridge]] opened by the Lady Mayoress, Mrs A.J.Smith.<br> | ||
4th. [[Ashton Junction]] opened.<br> | 4th. [[Ashton Junction]] opened.<br> | ||
| Line 10: | Line 11: | ||
4th. [[Ashton Swing Bridge North Signal Box]] opened.<br> | 4th. [[Ashton Swing Bridge North Signal Box]] opened.<br> | ||
4th. [[Canons Marsh|Canons Marsh Goods]] shed opened. | 4th. [[Canons Marsh|Canons Marsh Goods]] shed opened. | ||
== exact date unknown == | == exact date unknown == | ||
[[Sea Mills]] station rebuilt and the line through it doubled. | [[Sea Mills]] station rebuilt and the line through it doubled. | ||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 12:58, 1 January 2010
July
9th. Avoncliff Halt opened.
9th. Avon & Gloucester Railway officially closes.
September
15th. Ashton Gate Platform opened for football traffic.
October
1st. Regular passenger services started at Ashton Gate Platform.
3rd. Ashton Swing Bridge opened by the Lady Mayoress, Mrs A.J.Smith.
4th. Ashton Junction opened.
4th. Bristol Harbour Railway extended from Wapping Railway Wharf to Ashton Junction.
4th. Ashton Swing Bridge North Signal Box opened.
4th. Canons Marsh Goods shed opened.
exact date unknown
Sea Mills station rebuilt and the line through it doubled.