1910: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
== April ==
20th. Regular traffic starts using [[Royal Edward Dock]] station.
== May ==
== May ==
9th. [[North Filton Platform|Filton]] to [[Avonmouth]] line opened.
9th. [[Charlton Halt]] opened.<br>
9th. [[Charlton Halt]] opened.<br>
9th. [[Combe Hay Halt]] opened.<br>
9th. [[Filton West Junctions|Filton West]] signal box brought into use.<br>
9th. [[Filton West Junctions|Filton West]] signal box brought into use.<br>
9th. [[North Filton Platform|Filton (Gloucester Road) Halt]] opened.<br>
9th. [[North Filton Platform|Filton (Gloucester Road) Halt]] opened.<br>
9th. [[Hallen Halt]] opened.<br>
9th. [[Hallen Halt]] opened.<br>
9th. [[Henbury]] station opened.
9th. [[Henbury]] station opened.
 
== July ==
9th. [[St Philips Marsh]] engine shed opened.
== October ==
10th. First through trains from Manchester to Bournemouth.
== exact date unknown ==
== exact date unknown ==
'''Rownham'' station reverts to [[Clifton Bridge]].
'''Rownham''' station reverts to [[Clifton Bridge]].<br>
[[Avonmouth Town Goods]] signal box comes into use.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 15:08, 2 January 2010

April

20th. Regular traffic starts using Royal Edward Dock station.

May

9th. Filton to Avonmouth line opened. 9th. Charlton Halt opened.
9th. Combe Hay Halt opened.
9th. Filton West signal box brought into use.
9th. Filton (Gloucester Road) Halt opened.
9th. Hallen Halt opened.
9th. Henbury station opened.

July

9th. St Philips Marsh engine shed opened.

October

10th. First through trains from Manchester to Bournemouth.

exact date unknown

Rownham station reverts to Clifton Bridge.
Avonmouth Town Goods signal box comes into use.