1975: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
New page: == September == St Philips Marsh HST Depot opened at a cost of £1.5 million. It was built on the site of former cattle pens. Category:Timeline
 
No edit summary
 
Line 1: Line 1:
== May ==
5th. [[Wootten Bassett Junction]] to [[Bristol Parkway|Stoke Gifford]] line closed for relaying prior to introduction of HSTs.
== September ==
== September ==
[[St Philips Marsh HST Depot]] opened at a cost of £1.5 million. It was built on the site of former cattle pens.
[[St Philips Marsh HST Depot]] opened at a cost of £1.5 million. It was built on the site of former cattle pens.
== October ==
6th. [[Wootten Bassett Junction]] to [[Bristol Parkway|Stoke Gifford]] line reopens after track relaying in connection with the introduction of HSTs.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 17:39, 6 January 2010

May

5th. Wootten Bassett Junction to Stoke Gifford line closed for relaying prior to introduction of HSTs.

September

St Philips Marsh HST Depot opened at a cost of £1.5 million. It was built on the site of former cattle pens.

October

6th. Wootten Bassett Junction to Stoke Gifford line reopens after track relaying in connection with the introduction of HSTs.