1926: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
== March == | == March == | ||
Station master duties at [[Montpelier]] station transferred to [[Clifton Down]]. | Station master duties at [[Montpelier]] station transferred to [[Clifton Down]]. | ||
== May == | == May == | ||
23rd. [[Ashton Gate|Ashton Gate Platform]] rebuilt and reopened after having closed as a wartime economy measure. | 23rd. [[Ashton Gate|Ashton Gate Platform]] rebuilt and reopened after having closed as a wartime economy measure. | ||
== July == | == July == | ||
12th. [[North Filton Platform]] opened.<br> | 12th. [[North Filton Platform]] opened.<br> | ||
12th [[Long Ashton Halt]] reopens. | 12th [[Long Ashton Halt]] reopens. | ||
== December == | == December == | ||
23rd. [[Ham Green Halt]] opened. | 23rd. [[Ham Green Halt]] opened. | ||
== exact date unknown == | == exact date unknown == | ||
Replacement bridge erected at [[Lodge Causeway]]. | Replacement bridge erected at [[Lodge Causeway]].<br> | ||
Avonmouth Light Railway becomes part of the Joint GWR/LMS line.<br> | |||
Timber buildings at Avonmouth Dock station replaced by brick.<br> | |||
[[North Somerset Brick and Tile Works]] connected to the railway system. | |||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 16:59, 17 February 2010
March
Station master duties at Montpelier station transferred to Clifton Down.
May
23rd. Ashton Gate Platform rebuilt and reopened after having closed as a wartime economy measure.
July
12th. North Filton Platform opened.
12th Long Ashton Halt reopens.
December
23rd. Ham Green Halt opened.
exact date unknown
Replacement bridge erected at Lodge Causeway.
Avonmouth Light Railway becomes part of the Joint GWR/LMS line.
Timber buildings at Avonmouth Dock station replaced by brick.
North Somerset Brick and Tile Works connected to the railway system.