1898: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 6: Line 6:
3rd. Yate South signal box opened.
3rd. Yate South signal box opened.
== May ==
== May ==
2nd. [[Midsomer Norton and Welton|Welton]] renamed '''Welton and Midsomer Norton'''.<br>
23rd. [[St Annes Park]] station opened.
23rd. [[St Annes Park]] station opened.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 16:54, 17 February 2010

Dates Needed

Durley Hill Footbridge locomotive water troughs opened.
Pensford station extended and a new signal box opened.
Travelling Post Office equipment installed at Yate station.

January

3rd. Yate South signal box opened.

May

2nd. Welton renamed Welton and Midsomer Norton.
23rd. St Annes Park station opened.