Lockleaze Road: Difference between revisions
Jump to navigation
Jump to search
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
'''To Bristol or Bath''': [[Lockleaze Footbridge]] | '''To Bristol or Bath''': [[Lockleaze Footbridge]] | ||
<br>'''To Wales, The North or London''': [[Horfield]] | <br>'''To Wales, The North or London''': [[Horfield]] | ||
| Line 49: | Line 44: | ||
Image:Lockleaze Road15.jpg|The driver of a [[w:British Rail Class 220|Voyager]] phones [[Bristol Powerbox]] after coming to a halt at a red signal. | Image:Lockleaze Road15.jpg|The driver of a [[w:British Rail Class 220|Voyager]] phones [[Bristol Powerbox]] after coming to a halt at a red signal. | ||
</gallery> | </gallery> | ||
== | == 30.3.09 == | ||
30.3.09 | |||
<gallery> | <gallery> | ||
Image:Lockleaze Road20.jpg|A new security fence being installed along the railway. The land to the right of the fence is destined to become housing. | Image:Lockleaze Road20.jpg|A new security fence being installed along the railway. The land to the right of the fence is destined to become housing. | ||
</gallery> | </gallery> | ||
== 22.2.15 == | |||
<gallery> | |||
Image:LockleazeRoad28.jpg|Vegetation clearance along the railway in preparation of the reinstatement of four running lines. | |||
Image:LockleazeRoad29.jpg| | |||
Image:LockleazeRoad30.jpg| | |||
</gallery> | |||
== 2016 == | == 2016 == | ||
<gallery> | <gallery> | ||
Image:Lockleazeroad22.jpg|[[150122]] trundles towards Bristol. The railway is being prepared for the reinstatement of the four tracks. | Image:Lockleazeroad22.jpg|[[150122]] trundles towards Bristol. The railway is being prepared for the reinstatement of the four tracks. | ||
Image:Lockleazeroad21.jpg|The previous four-aspect signal has been replaced with a modern version. | Image:Lockleazeroad21.jpg|The previous four-aspect signal has been replaced with a modern version. | ||
</gallery> | |||
== 2018 == | |||
1st and 2nd April. 7th and 13th May. 14th Oct. | |||
<gallery> | |||
Image:70804-1.jpg|[[70804]] stands at the head of a ballast train during engineering works over the Easter weekend. | |||
Image:Lockleazeroad24.jpg|One day later and sleepers have been placed on the freshly laid ballast. | |||
Image:Lockleazeroad23.jpg|Looking south from the bridge at piles of sleepers placed on the mainline. | |||
Image:Lockleazeroad25.jpg|A zoomed view up the hill showing a gap in the track awaiting a junction. | |||
Image:Lockleazeroad26.jpg|Over the weekend of the 12th May the junction was installed. | |||
Image:Lockleazeroad27.jpg|The view south showing [[Lockleaze Footbridge|a new footbridge]] spanning the track. | |||
Image:LockleazeRoad31.jpg|Looking north in October. | |||
Image:LockleazeRoad32.jpg|And south. | |||
</gallery> | </gallery> | ||
| Line 63: | Line 76: | ||
* [http://uk.youtube.com/watch?v=6KrgMe8wPJI 66057 hauls a coal train] 25.10.06 | * [http://uk.youtube.com/watch?v=6KrgMe8wPJI 66057 hauls a coal train] 25.10.06 | ||
* [http://uk.youtube.com/watch?v=LVlzHJeIrts 47839 and 47805 hurtle down the hill] 26.3.07 | * [http://uk.youtube.com/watch?v=LVlzHJeIrts 47839 and 47805 hurtle down the hill] 26.3.07 | ||
* [http://uk.youtube.com/watch?v=x30YS6oRfco 6201 Princess Elizabeth climbs Filton Bank] 10.11.07 | * [http://uk.youtube.com/watch?v=x30YS6oRfco 6201 Princess Elizabeth climbs Filton Bank] 10.11.07 | ||
* [http://www.youtube.com/watch?v=9G3FM2gssiA 55022 Royal Scots Gray climbs Filton Bank] 28.6.08 | * [http://www.youtube.com/watch?v=9G3FM2gssiA 55022 Royal Scots Gray climbs Filton Bank] 28.6.08 | ||
Latest revision as of 16:59, 30 July 2022
To Bristol or Bath: Lockleaze Footbridge
To Wales, The North or London: Horfield
1983
-
The view from the bridge with the remains of Horfield station visible in the distance. © P.D.RendallThe view from the bridge with the remains of Horfield station visible in the distance. © P.D.Rendall
-
The view of Lockleaze Road from Bonnington Walk bridge. © P.D.Rendall
1995
-
A pair of 37/0s pound up Filton Bank with a Railtour. © Craig Munday
2004
-
Looking south towards Lockleaze Footbridge while 60085 hauls an engineering train up the hill.
-
Ah.. bliss.. 40145 coasts past on the Western Whisperer on the 22nd May 2004. Not the best photo I've ever taken... guess who nearly dropped his camera five seconds previously..
2005
-
The view south on 6.8.05. A sight seeing balloon that was based in Castle Park is visible in the distance.
-
A Voyager heads for Temple Meads. 6.8.05
-
150244 climbs Filton Bank. 6.8.05
-
A December 2005 view of the bridge. It was due to be transformed in 2006 as part of a Feeling Good, Feeling Safe Group's community project.
2006
2007
24.7.07
-
Work started on the transformation in 2007 rather than 2006.
-
27.7.07
-
Work starts on the other side of the bridge. 30.7.07
-
And is finished the next day.
13.9.07
-
The driver of a Voyager phones Bristol Powerbox after coming to a halt at a red signal.
30.3.09
-
A new security fence being installed along the railway. The land to the right of the fence is destined to become housing.
22.2.15
-
Vegetation clearance along the railway in preparation of the reinstatement of four running lines.
2016
-
150122 trundles towards Bristol. The railway is being prepared for the reinstatement of the four tracks.
-
The previous four-aspect signal has been replaced with a modern version.
2018
1st and 2nd April. 7th and 13th May. 14th Oct.
-
70804 stands at the head of a ballast train during engineering works over the Easter weekend.
-
One day later and sleepers have been placed on the freshly laid ballast.
-
Looking south from the bridge at piles of sleepers placed on the mainline.
-
A zoomed view up the hill showing a gap in the track awaiting a junction.
-
Over the weekend of the 12th May the junction was installed.
-
The view south showing a new footbridge spanning the track.
-
Looking north in October.
-
And south.