1967: Difference between revisions
Jump to navigation
Jump to search
New page: == August == 7th. Bristol East Depot closed. |
No edit summary |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
Down loop at [[Patchway]] taken out of use. | |||
== February == | |||
6th. Last banana train leaves [[Avonmouth]]. | |||
== March == | |||
6th. [[St Annes Park]] station became unstaffed.<br> | |||
31st. Second central road and bay platform at [[Bath Spa]] taken out of use. | |||
== April == | |||
1st. [[St Philips]] station closed to goods. | |||
== May == | |||
[[Montpelier]] signal box closed. | |||
== July == | |||
17th. [[Montpelier]] station became unstaffed. | |||
== August == | == August == | ||
7th. [[East Depot|Bristol East Depot]] closed. | |||
7th. Bristol East Depot closed. | == December == | ||
[[Midford]] station demolished. | |||
[[Category:Timeline]] | |||
Latest revision as of 21:17, 5 January 2010
Down loop at Patchway taken out of use.
February
6th. Last banana train leaves Avonmouth.
March
6th. St Annes Park station became unstaffed.
31st. Second central road and bay platform at Bath Spa taken out of use.
April
1st. St Philips station closed to goods.
May
Montpelier signal box closed.
July
17th. Montpelier station became unstaffed.
August
7th. Bristol East Depot closed.
December
Midford station demolished.