1928: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Portbury Shipyard Loop and signal box reopened.
== July ==
== July ==
9th. Through services between [[Avonmouth]] and [[Pilning]] commenced.<br>
9th. Through services between [[Avonmouth]] and [[Pilning]] commenced.<br>
9th. [[Cross Hands Halt]] opened.<br>
9th. [[Cross Hands Halt]] opened.<br>
9th. [[Pilning Low Level]] station opened.
9th. [[New Passage Halt]] opened.<br>
9th. [[Nightingale Valley Halt]] opened<br>
9th. [[Pilning Low Level]] station opened.<br>
9th. [[Pilning]] renamed '''Pilning High Level'''.
9th. [[Pilning]] renamed '''Pilning High Level'''.
== August ==
'''Ashton Gate Platform''' renamed [[Ashton Gate]].
== October ==
== October ==
13th. The [[Charfield]] railway disaster takes place.
13th. The [[Charfield]] railway disaster takes place.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 12:07, 3 January 2010

Portbury Shipyard Loop and signal box reopened.

July

9th. Through services between Avonmouth and Pilning commenced.
9th. Cross Hands Halt opened.
9th. New Passage Halt opened.
9th. Nightingale Valley Halt opened
9th. Pilning Low Level station opened.
9th. Pilning renamed Pilning High Level.

August

Ashton Gate Platform renamed Ashton Gate.

October

13th. The Charfield railway disaster takes place.