1874: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
== June ==
Mixed gauge track brought into use between Bristol and Bath.<br>
21st. First standard gauge train runs between Swindon and Bristol.
== July ==
20th. Somerset & Dorset Bath extension opens.
20th. [[Midford]] station opened.<br>
20th. [[Radstock North|Radstock]] (S&DJR) station opened.<br>
20th. [[Wellow]] station opened.
== October ==
== October ==
1st. [[Montpelier]] station opened as '''Montpellier''' (two 'l's}
1st. [[Montpelier]] station opened as '''Montpellier''' (two 'l's}
[[Category:Timeline]]
[[Category:Timeline]]
== exact date unknown ==
== exact date unknown ==
Line through [[Lawrence Hill]] doubled and a new platform opened.
Line through [[Lawrence Hill]] and [[Stapleton Road]] doubled and a new platform opened at each.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 21:52, 20 December 2009

June

Mixed gauge track brought into use between Bristol and Bath.
21st. First standard gauge train runs between Swindon and Bristol.

July

20th. Somerset & Dorset Bath extension opens. 20th. Midford station opened.
20th. Radstock (S&DJR) station opened.
20th. Wellow station opened.

October

1st. Montpelier station opened as Montpellier (two 'l's}

exact date unknown

Line through Lawrence Hill and Stapleton Road doubled and a new platform opened at each.