1933: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== April ==
== April ==
30th. A rebuilt [[Ashley Hill]] station reopened after line quadrupled.
30th. A rebuilt [[Ashley Hill]] station reopened after line quadrupled.<br>
 
30th. '''Horfield Platform''' station renamed as [[Horfield]].
== November ==
== May ==
'''Horfield Platform''' station renamed as [[Horfield]].<br>
21st. A rebuilt [[Parson Street]] station opened after quadrupling of the line west of [[Temple Meads]]. The suffix 'Platform' was dropped at the same time.
'''Parson Street Halt''' renamed as [[Parson Street]] when line through station was quadrupled.
== July ==
3rd. [[Weston Milton|Weston Milton Halt]] opens.


== Exact date unknown ==
== Exact date unknown ==
A rebuilt [[Bedminster Station]] reopened after line quadrupled.
A rebuilt [[Bedminster Station]] reopened after line quadrupled.<br>
'''Portishead Junction''' became [[Parson Street Junction]] following rebuilding.


[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 21:33, 9 February 2008

April

30th. A rebuilt Ashley Hill station reopened after line quadrupled.
30th. Horfield Platform station renamed as Horfield.

May

21st. A rebuilt Parson Street station opened after quadrupling of the line west of Temple Meads. The suffix 'Platform' was dropped at the same time.

July

3rd. Weston Milton Halt opens.

Exact date unknown

A rebuilt Bedminster Station reopened after line quadrupled.
Portishead Junction became Parson Street Junction following rebuilding.