Avon Crescent Level Crossing: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
 
Line 11: Line 11:
== 2018 ==
== 2018 ==
<gallery>
<gallery>
Image:avoncrescent4.jpg|The same viewpoint as in the first photo above. The alignment has become an access path to a new Metrobus route built along the Harbour Railway branch.
Image:avoncrescent4.jpg|The same viewpoint as in the first photo above. The alignment has become an access path to a new Metrobus route built along the Harbour Railway branch. 1.4.18
</gallery>
</gallery>
[[Category:GWR]]
[[Category:GWR]]
[[Category:Level Crossings]]
[[Category:Level Crossings]]

Latest revision as of 18:21, 25 July 2022

To Canons Marsh: Avon Crescent Signal Box
To Ashton Junction: Cumberland Road West

History

This was also the location of a pedestrian footbridge across the railway.

Gallery

2018