In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
==Track Plans ==
<gallery>
Image:Avoncliff Freshford Track Plan 1988.jpg|A track plan of Freshford and surrounding area from [[1988]]
</gallery>
== Gallery ==
== Gallery ==
<gallery>
<gallery>

Revision as of 18:23, 1 February 2008

<googlemap lat="51.346215" lon="-2.300262"> 51.341906, -2.300917, Freshford </googlemap>

To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff

History

In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.