1988: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
== January ==
25th. [[Avonmouth Town Goods]] signal box closed.<br>
25th. [[Hallen Marsh Junction]] signal box closed.
25th. [[Holesmouth Junction]] signal box closed.<br>
25th. Satellite signal panel installed at [[St Andrews Junction]] signal box.
== No Actual Date ==
== No Actual Date ==
 
[[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.
[[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.<br>
The signal box at [[Avonmouth Dock Junction]] closed.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 17:07, 7 January 2010

January

25th. Avonmouth Town Goods signal box closed.
25th. Hallen Marsh Junction signal box closed. 25th. Holesmouth Junction signal box closed.
25th. Satellite signal panel installed at St Andrews Junction signal box.

No Actual Date

Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.