1905: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== May ==
1st. Nailsea Station renamed [[Nailsea and Backwell]]
== exact date unknown ==
== exact date unknown ==
[[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened.<br>
[[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened.<br>
[[Fishponds|Fishponds Signal Box]] fitted with a new frame.
[[Fishponds|Fishponds Signal Box]] fitted with a new frame.
[[Category:Timeline]]
[[Category:Timeline]]

Revision as of 22:04, 19 January 2008

May

1st. Nailsea Station renamed Nailsea and Backwell

exact date unknown

Crown Brickyard Level Crossing opened.
Fishponds Signal Box fitted with a new frame.