2004: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== April ==
18th. Extension to [[Filton Abbey Wood]] footbridge put in place.
== May ==
== May ==



Revision as of 15:28, 13 January 2008

April

18th. Extension to Filton Abbey Wood footbridge put in place.

May

1st. Avon Riverside station on the Avon Valley Railway officially opened.

June

29th. Third platform at Filton Abbey Wood station brought into use.

August

Engineering sidings at Bristol East Depot lifted.