2004: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== April == | |||
18th. Extension to [[Filton Abbey Wood]] footbridge put in place. | |||
== May == | == May == | ||
Revision as of 15:28, 13 January 2008
April
18th. Extension to Filton Abbey Wood footbridge put in place.
May
1st. Avon Riverside station on the Avon Valley Railway officially opened.
June
29th. Third platform at Filton Abbey Wood station brought into use.
August
Engineering sidings at Bristol East Depot lifted.