1905: Difference between revisions
Jump to navigation
Jump to search
BristleGWR (talk | contribs) No edit summary |
BristleGWR (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
== May == | == May == | ||
1st. Nailsea Station renamed [[Nailsea and Backwell]] | 1st. Nailsea Station renamed [[Nailsea and Backwell]] | ||
== December == | |||
12th [[Sandford and Banwell|Sandford]] signal box opened. | |||
== exact date unknown == | == exact date unknown == | ||
[[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened.<br> | [[Avonmouth Dock Junction|Crown Brickyard Level Crossing]] opened.<br> | ||
[[Fishponds|Fishponds Signal Box]] fitted with a new frame. | [[Fishponds|Fishponds Signal Box]] fitted with a new frame. | ||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Revision as of 18:47, 10 February 2008
May
1st. Nailsea Station renamed Nailsea and Backwell
December
12th Sandford signal box opened.
exact date unknown
Crown Brickyard Level Crossing opened.
Fishponds Signal Box fitted with a new frame.