Freshford: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:


== History ==
== History ==
In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed. At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
== Gallery ==
== Gallery ==
<gallery>
<gallery>

Revision as of 10:28, 11 July 2007

To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff

grid reference Template:Oscoor

History

In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.

Gallery