1907: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
== September ==
== September ==
26th. A stone built station building brought into use at [[Burrington]].
26th. A stone built station building brought into use at [[Burrington]].
== exact date unknown ==
Footbridge installed at [[Nailsea and Backwell]] station.
[[Category:Timeline]]
[[Category:Timeline]]

Revision as of 01:20, 13 February 2008

August

25th. original Clifton Bridge signal box closed.

September

26th. A stone built station building brought into use at Burrington.

exact date unknown

Footbridge installed at Nailsea and Backwell station.