Freshford: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
Line 8: Line 8:


== History ==
== History ==
Opened on the 2nd February [[1857]]. Closed to goods on 10the June [[1963]].
Opened on the 2nd February [[1857]]. Closed to goods on 10th June [[1963]].


In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
==Track Plans ==
==Track Plans ==
<gallery>
<gallery>

Revision as of 16:03, 8 March 2009

<googlemap lat="51.346215" lon="-2.300262"> 51.341906, -2.300917, Freshford </googlemap>

To Bathampton Junction: Limpley Stoke
To Bradford Junction: Avoncliff Aqueduct

History

Opened on the 2nd February 1857. Closed to goods on 10th June 1963.

In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.

Track Plans

2004

2009