Freshford: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:
</gallery>
</gallery>
[[Category:GWR]]
[[Category:GWR]]
[[Category:Mark Lippiatt]]
[[Category:Stations]]
[[Category:Stations]]

Revision as of 21:14, 1 October 2007

To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff

History

In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.

Gallery