1907: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
== March ==
== March ==
18th. [[Hampton Row Halt]] opened.
18th. [[Hampton Row Halt]] opened.
== May ==
5th. New signals put in place on the Coalpit Heath, Frog Lane Colliery branch.<br>
15th. Several Empire Prime Ministers arrive at [[Redland]] station en route to visit the docks under construction at Avonmouth.
== July ==
== July ==
14th. New signal box at [[Axbridge]] opened.
14th. New signal box at [[Axbridge]] opened.
== August ==
== August ==
8th. Weston, Clevedon & Portishead Railway opens to Portishead
25th. original [[Clifton Bridge]] signal box closed.<br>
25th. original [[Clifton Bridge]] signal box closed.<br>
== September ==
== September ==
26th. A stone built station building brought into use at [[Burrington]].
26th. A stone built station building brought into use at [[Burrington]].
== exact date unknown ==
== exact date unknown ==
Footbridge installed at [[Nailsea and Backwell]] station.
Footbridge installed at [[Nailsea and Backwell]] station.<br>
Second platform added at [[Sea Mills]] station.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 13:00, 1 January 2010

March

18th. Hampton Row Halt opened.

May

5th. New signals put in place on the Coalpit Heath, Frog Lane Colliery branch.
15th. Several Empire Prime Ministers arrive at Redland station en route to visit the docks under construction at Avonmouth.

July

14th. New signal box at Axbridge opened.

August

8th. Weston, Clevedon & Portishead Railway opens to Portishead 25th. original Clifton Bridge signal box closed.

September

26th. A stone built station building brought into use at Burrington.

exact date unknown

Footbridge installed at Nailsea and Backwell station.
Second platform added at Sea Mills station.