1988: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== January == | |||
25th. [[Avonmouth Town Goods]] signal box closed.<br> | |||
25th. [[Hallen Marsh Junction]] signal box closed. | |||
25th. [[Holesmouth Junction]] signal box closed.<br> | |||
25th. Satellite signal panel installed at [[St Andrews Junction]] signal box. | |||
== No Actual Date == | == No Actual Date == | ||
[[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed. | |||
[[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed | |||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 17:07, 7 January 2010
January
25th. Avonmouth Town Goods signal box closed.
25th. Hallen Marsh Junction signal box closed.
25th. Holesmouth Junction signal box closed.
25th. Satellite signal panel installed at St Andrews Junction signal box.
No Actual Date
Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.