1972: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
[[File:Polythene Sheet.jpg|thumb|left|Preparing the [[Badminton]] line for HSTs.]]
[[File:Polythene Sheet.jpg|thumb|left|Preparing the [[Badminton]] line for HSTs.]]
<br clear=all>
<br clear=all>
 
== August ==
[[File:Tytherington Branch Relaying.jpg|thumb|left|Relaying the line from [[Yate]] to [[Tytherington Quarry]].]]
<br clear=all>
== Exact date unknown ==
== Exact date unknown ==
Barriers installed at [[Avonmouth Dock Junction]].<br>
Barriers installed at [[Avonmouth Dock Junction]].<br>
Line singled through [[Weston Milton]].
Line singled through [[Weston Milton]].
[[Category:Timeline]]
[[Category:Timeline]]

Revision as of 14:57, 13 January 2010

January

31st. Yatton West Signal Box closes.

March

20th. Highbridge signal box closed.

May

1st. Bristol Parkway station opened.

Tytherington Quarry opposition.


Bristol Suburban Railway Society formation.


Preparing the Badminton line for HSTs.


August

Relaying the line from Yate to Tytherington Quarry.


Exact date unknown

Barriers installed at Avonmouth Dock Junction.
Line singled through Weston Milton.