1972: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 8: Line 8:
[[File:BSRS Snippet.jpg|thumb|left|[[:Category:AVR|Bristol Suburban Railway Society]] formation.]]<br>
[[File:BSRS Snippet.jpg|thumb|left|[[:Category:AVR|Bristol Suburban Railway Society]] formation.]]<br>
[[File:Polythene Sheet.jpg|thumb|left|Preparing the [[Badminton]] line for HSTs.]]
[[File:Polythene Sheet.jpg|thumb|left|Preparing the [[Badminton]] line for HSTs.]]
<br clear=all>
== July ==
[[File:Mangotsfield - BathLifted.jpg|thumb|left|Lifting the [[Mangotsfield]] - [[Bath Green Park]] line.]]
<br clear=all>
<br clear=all>
== August ==
== August ==

Latest revision as of 15:19, 13 January 2010

January

31st. Yatton West Signal Box closes.

March

20th. Highbridge signal box closed.

May

1st. Bristol Parkway station opened.

Tytherington Quarry opposition.


Bristol Suburban Railway Society formation.


Preparing the Badminton line for HSTs.


July

Lifting the Mangotsfield - Bath Green Park line.


August

Relaying the line from Yate to Tytherington Quarry.


Exact date unknown

Barriers installed at Avonmouth Dock Junction.
Line singled through Weston Milton.