1988: Difference between revisions
Jump to navigation
Jump to search
New page: == No Actual Date == Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed. |
No edit summary |
||
| Line 1: | Line 1: | ||
== No Actual Date == | == No Actual Date == | ||
[[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed. | [[Freshford]] station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.<br> | ||
The signal box at [[Avonmouth Dock Junction]] closed. | |||
[[Category:Timeline]] | |||
Revision as of 13:40, 21 December 2007
No Actual Date
Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.
The signal box at Avonmouth Dock Junction closed.