In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed. At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter. | In February [[2006]], Platform 2 was raised by 30cm to reduce the large gap between train and platform. It was lowered in [[1988]] as part of a realignment of track through the station which allowed trains to pass at a faster speed. At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter. | ||
== Gallery == | == Gallery == | ||
<gallery> | <gallery> | ||
Revision as of 10:27, 10 July 2007
To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff
grid reference Template:Oscoor
History
In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed. At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
Gallery
-
Looking along the line at Freshford Station. © Mark Lippiatt
-
The car park and footbridge. © Mark Lippiatt