Freshford: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
'''To Bathampton Junction''': [[Bathampton_Station_and_Junction|Bathampton]] | '''To Bathampton Junction''': [[Bathampton_Station_and_Junction|Bathampton]] | ||
<br>'''To Bradford Junction''': [[Avoncliff]] | <br>'''To Bradford Junction''': [[Avoncliff]] | ||
== History == | == History == | ||
Revision as of 17:02, 11 July 2007
To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff
History
In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.
Gallery
-
Looking along the line at Freshford Station. © Mark Lippiatt
-
The car park and footbridge. © Mark Lippiatt