2004: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== February ==
14th-15th. Crossover and point at [[Tyntesfield Sidings]] removed.
== April ==
== April ==
18th. Extension to [[Filton Abbey Wood]] footbridge put in place.
18th. Extension to [[Filton Abbey Wood]] footbridge put in place.

Revision as of 00:09, 13 February 2008

February

14th-15th. Crossover and point at Tyntesfield Sidings removed.

April

18th. Extension to Filton Abbey Wood footbridge put in place.

May

1st. Avon Riverside station on the Avon Valley Railway officially opened.

June

29th. Third platform at Filton Abbey Wood station brought into use.

August

Engineering sidings at Bristol East Depot lifted.