1988

From The Bristol Railway Archive
Revision as of 17:07, 7 January 2010 by Weirdoldhattie (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

January

25th. Avonmouth Town Goods signal box closed.
25th. Hallen Marsh Junction signal box closed. 25th. Holesmouth Junction signal box closed.
25th. Satellite signal panel installed at St Andrews Junction signal box.

No Actual Date

Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.