1988
January
25th. Avonmouth Town Goods signal box closed.
25th. Hallen Marsh Junction signal box closed.
25th. Holesmouth Junction signal box closed.
25th. Satellite signal panel installed at St Andrews Junction signal box.
No Actual Date
Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.