1907

From Bristol Railway Archive
Revision as of 01:20, 13 February 2008 by Weirdoldhattie (talk | contribs)
Jump to navigation Jump to search

August

25th. original Clifton Bridge signal box closed.

September

26th. A stone built station building brought into use at Burrington.

exact date unknown

Footbridge installed at Nailsea and Backwell station.