1928

From The Bristol Railway Archive
Revision as of 22:30, 31 January 2008 by Weirdoldhattie (talk | contribs)
Jump to navigation Jump to search

July

9th. Through services between Avonmouth and Pilning commenced.
9th. Cross Hands Halt opened.
9th. New Passage Halt opened.
9th. Pilning Low Level station opened.
9th. Pilning renamed Pilning High Level.

August

Ashton Gate Platform renamed Ashton Gate.

October

13th. The Charfield railway disaster takes place.