1972

From The Bristol Railway Archive
Revision as of 14:57, 13 January 2010 by Weirdoldhattie (talk | contribs)
Jump to navigation Jump to search

January

31st. Yatton West Signal Box closes.

March

20th. Highbridge signal box closed.

May

1st. Bristol Parkway station opened.

Tytherington Quarry opposition.


Bristol Suburban Railway Society formation.


Preparing the Badminton line for HSTs.


August

Relaying the line from Yate to Tytherington Quarry.


Exact date unknown

Barriers installed at Avonmouth Dock Junction.
Line singled through Weston Milton.