1899

From Bristol Railway Archive
Revision as of 13:44, 1 January 2010 by Weirdoldhattie (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

January

12th. Hotwells station flooded by high tide with passengers taken off the trains by boat.

August

1st. Twerton station renamed as Twerton-on-Avon.

October

22nd. New footbridge installed at Warmley station.