1908

From The Bristol Railway Archive
Revision as of 13:03, 1 January 2010 by Weirdoldhattie (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Avonmouth Light Railway opens.

March

9th. Loops joining the GWR and LMS at Yate opened.

July

1st. GWR starts direct service between Wolverhampton and Bristol using running powers over the MR.
8th. Royal Edward Dock station opens.

October

27th. Patchway and Stoke Gifford station renamed Patchway.