1928

From The Bristol Railway Archive
Revision as of 12:07, 3 January 2010 by Weirdoldhattie (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Portbury Shipyard Loop and signal box reopened.

July

9th. Through services between Avonmouth and Pilning commenced.
9th. Cross Hands Halt opened.
9th. New Passage Halt opened.
9th. Nightingale Valley Halt opened
9th. Pilning Low Level station opened.
9th. Pilning renamed Pilning High Level.

August

Ashton Gate Platform renamed Ashton Gate.

October

13th. The Charfield railway disaster takes place.