1898

From The Bristol Railway Archive
Revision as of 16:54, 17 February 2010 by Weirdoldhattie (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Dates Needed

Durley Hill Footbridge locomotive water troughs opened.
Pensford station extended and a new signal box opened.
Travelling Post Office equipment installed at Yate station.

January

3rd. Yate South signal box opened.

May

2nd. Welton renamed Welton and Midsomer Norton.
23rd. St Annes Park station opened.