1988

From The Bristol Railway Archive
Revision as of 13:40, 21 December 2007 by Weirdoldhattie (talk | contribs)
Jump to navigation Jump to search

No Actual Date

Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.
The signal box at Avonmouth Dock Junction closed.