1976

From The Bristol Railway Archive
Revision as of 21:01, 22 January 2008 by Weirdoldhattie (talk | contribs) (New page: == exact date unknown == The number of tracks across Ashton Swing Bridge reduced from two to one. Category:Timeline)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

exact date unknown

The number of tracks across Ashton Swing Bridge reduced from two to one.