Freshford

From Bristol Railway Archive
Jump to navigation Jump to search

To Bathampton Junction: Bathampton
To Bradford Junction: Avoncliff

grid reference Template:Oscoor

History

In February 2006, Platform 2 was raised by 30cm to reduce the large gap between train and platform. (It was lowered in 1988 as part of a realignment of track through the station which allowed trains to pass at a faster speed). At the same time the station also received additional improvements including better lighting and the construction of a new waiting shelter.

Gallery