2004
February
14th-15th. Crossover and point at Tyntesfield Sidings removed.
April
18th. Extension to Filton Abbey Wood footbridge put in place.
May
1st. Avon Riverside station on the Avon Valley Railway officially opened.
June
29th. Third platform at Filton Abbey Wood station brought into use.
August
Engineering sidings at Bristol East Depot lifted.