2004

From The Bristol Railway Archive
Revision as of 00:09, 13 February 2008 by Weirdoldhattie (talk | contribs)
Jump to navigation Jump to search

February

14th-15th. Crossover and point at Tyntesfield Sidings removed.

April

18th. Extension to Filton Abbey Wood footbridge put in place.

May

1st. Avon Riverside station on the Avon Valley Railway officially opened.

June

29th. Third platform at Filton Abbey Wood station brought into use.

August

Engineering sidings at Bristol East Depot lifted.