This Way to the Forums! Join in and Post  :)

And an Archive of the earlier Forum! This one is read only but brilliant stuff!

1886

From Bristol Railway Archive
Jump to navigation Jump to search

May

29th. Bristol Loop Line (Rhubarb Loop) opens.

September

1st. Severn Tunnel opened to goods traffic.

October

1st. Steamer services from Portishead Pier ceased.

December

1st. New Passage Pier closed with the opening of the Severn Tunnel.
1st. Pilning station opened.
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.