This Way to the Forums! Join in and Post  :)

And an Archive of the earlier Forum! This one is read only but brilliant stuff!

1899

From Bristol Railway Archive
Jump to navigation Jump to search

January

12th. Hotwells station flooded by high tide with passengers taken off the trains by boat.

August

1st. Twerton station renamed as Twerton-on-Avon.

October

22nd. New footbridge installed at Warmley station.