This Way to the Forums! Join in and Post :)
And an Archive of the earlier Forum! This one is read only but brilliant stuff!
1917
Jump to navigation
Jump to search
March
10th. Hallen Halt reopened after closing in 1915.
April
2nd. Twerton-on-Avon station closed as a wartime measure.
29th. Hampton Row Halt closed.
May
Doubling of Filton to Avonmouth line completed.
14th. Hotwells Halt opened.
November
1st. Ashton Gate Platform closed as a wartime economy measure.
exact date not known
Line between Avonmouth and Filton doubled.
Hallen Marsh Junction signal box opens.