1968: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
== January ==
== January ==
21st. Elevated signal box at [[Bath Spa]] closed.
21st. Elevated signal box at [[Bath Spa]] closed.


== May ==
== May ==
5th. [[Weston (Bath)]] signal box closed.<br>
6th. Pilning High Level station name reverts to [[Pilning]].<br>
12th. [[Fishponds|Fishponds Signal Box]] closed.<br>
[[Clevedon]] station site demolished. <br>
26th. [[13 Arches Viaduct]] over the River Frome blown up to make way for the M32.
== June ==
3rd. [[Badminton]] station closed to passengers.
== July ==
The [[Severn Beach]] to [[Pilning]] line closed.
== September ==
[[Bedminster]] station became unstaffed.


5th. [[Weston (Bath)]] signal box closed.
== October ==
14th. [[Coaley|Coaley Junction]] signal box closed.<br>
14th. [[Patchway]] station became unstaffed.


[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 21:19, 5 January 2010

January

21st. Elevated signal box at Bath Spa closed.

May

5th. Weston (Bath) signal box closed.
6th. Pilning High Level station name reverts to Pilning.
12th. Fishponds Signal Box closed.
Clevedon station site demolished.
26th. 13 Arches Viaduct over the River Frome blown up to make way for the M32.

June

3rd. Badminton station closed to passengers.

July

The Severn Beach to Pilning line closed.

September

Bedminster station became unstaffed.

October

14th. Coaley Junction signal box closed.
14th. Patchway station became unstaffed.