1968
Jump to navigation
Jump to search
January
21st. Elevated signal box at Bath Spa closed.
May
5th. Weston (Bath) signal box closed.
6th. Pilning High Level station name reverts to Pilning.
12th. Fishponds Signal Box closed.
Clevedon station site demolished.
26th. 13 Arches Viaduct over the River Frome blown up to make way for the M32.
June
3rd. Badminton station closed to passengers.
July
The Severn Beach to Pilning line closed.
September
Bedminster station became unstaffed.
October
14th. Coaley Junction signal box closed.
14th. Patchway station became unstaffed.