1968: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
6th. Pilning High Level station name reverts to [[Pilning]].<br> | 6th. Pilning High Level station name reverts to [[Pilning]].<br> | ||
12th. [[Fishponds|Fishponds Signal Box]] closed.<br> | 12th. [[Fishponds|Fishponds Signal Box]] closed.<br> | ||
[[Clevedon]] station site demolished. | [[Clevedon]] station site demolished. <br> | ||
26th. [[13 Arches Viaduct]] over the River Frome blown up to make way for the M32. | |||
== June == | == June == | ||
3rd. [[Badminton]] station closed to passengers. | 3rd. [[Badminton]] station closed to passengers. | ||
Latest revision as of 21:19, 5 January 2010
January
21st. Elevated signal box at Bath Spa closed.
May
5th. Weston (Bath) signal box closed.
6th. Pilning High Level station name reverts to Pilning.
12th. Fishponds Signal Box closed.
Clevedon station site demolished.
26th. 13 Arches Viaduct over the River Frome blown up to make way for the M32.
June
3rd. Badminton station closed to passengers.
July
The Severn Beach to Pilning line closed.
September
Bedminster station became unstaffed.
October
14th. Coaley Junction signal box closed.
14th. Patchway station became unstaffed.