Pump House Siding: Difference between revisions
Jump to navigation
Jump to search
BristleGWR (talk | contribs) No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
map></div> | |||
</div> | |||
'''To Severn Beach''': [[Green Lane Level Crossing]]<br> | '''To Severn Beach''': [[Green Lane Level Crossing]]<br> | ||
'''To Pilning''': [[New Passage Halt]]<br> | '''To Pilning''': [[New Passage Halt]]<br> | ||
Latest revision as of 19:36, 15 April 2026
map>
To Severn Beach: Green Lane Level Crossing
To Pilning: New Passage Halt
To New Passage Pier: Severn Tunnel Construction Line
History
Before electric pumps were installed, this pumping station was coal-fired and rail-connected. A siding ran from here to the Severn Beach - Pilning loop.
This siding was original connected to the New Passage Pier line and ran to a shaft near the Pilning Portal of the Severn Tunnel.
Gallery
-
The pump on the Bristol side of the River Severn that helps prevent the Severn Tunnel flooding.
-
An outlet pipe on a nearby beach. This shingle beach was formed from debris brought up from the tunnel's workings.
-
The Second Severn Crossing passes overhead right next to the alignment of the Severn Tunnel.