Pump House Siding: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
<div style="float:right">
map></div>
<googlemap lat="51.568161" lon="-2.662725">
51.567267, -2.661095, Pump House Siding
51.568274, -2.665215, [[Severn Tunnel]] Pumping station
</googlemap>
</div>
'''To Severn Beach''': [[Green Lane Level Crossing]]<br>
'''To Severn Beach''': [[Green Lane Level Crossing]]<br>
'''To Pilning''': [[New Passage Halt]]<br>
'''To Pilning''': [[New Passage Halt]]<br>

Latest revision as of 19:36, 15 April 2026

map>

To Severn Beach: Green Lane Level Crossing
To Pilning: New Passage Halt
To New Passage Pier: Severn Tunnel Construction Line

History

Before electric pumps were installed, this pumping station was coal-fired and rail-connected. A siding ran from here to the Severn Beach - Pilning loop.

This siding was original connected to the New Passage Pier line and ran to a shaft near the Pilning Portal of the Severn Tunnel.

Gallery